Nisbets : Case Study
Case Study : The Burgate School
Doughty Engineering is a global leader in manufacturing of rigging, suspension and lifting equipment for the film and TV industry. Empower installed a 60KW system over two buildings, consisting of 178 Sunedison panels and four SolarEdge inverters.
Key Facts
Installed July / Aug 2015
Size 60 KWp
Panels Used Sunedison
Inverter SolarEdge
Projected Output 60,578 KWH
Annual Savings £12,550
Total Income Over 20 Years £246,434