Case Studies : Brixton St Marys Primary School

Having completed a wide range of high-profile projects for school and local authorities. Empower installed a 15.9 KWp in Brixton St. Mary’s Primary School. SunEdison approved a free solar system install. The system was designed with SolarEdge technology to maximise efficiency, providing up to 25% more energy than competitors.
Key Facts

Installed June 2015
Size 15.9 KWP
Panels Used Sunedison
Inverter Solaredge
Projected Output 15,587 KWh