Case Studies : Key Industrial Equipment
![](https://empowerenergy.co.uk/wp-content/uploads/2017/07/GW_martin_LED.png)
![](https://empowerenergy.co.uk/wp-content/uploads/2017/07/GW_martin_LED.png)
![](https://empowerenergy.co.uk/wp-content/uploads/2017/07/GW_martin_LED.png)
Case Studies : GW Martin
Westland Helicopters were looking to improve and enhance working conditions, Empower replaced their existing lighting with the latest LED high bay technology. Using our in house team, we produced a full 3D simulation model to calculate the recommended lighting level.
Key Facts
Annual Savings £7,868
Expected Annual Usage 33,660 KWh