The system was designed without true shade analysis. Empower installed the system coordinating with the busy charity operation in the building in question. Working together with our scaffolders, we completed the project in 4 days.
Key Facts

Installed March 2017
Size 51.2 KWp
Installation Capacity 2 x SolarEdge SE25KW inverter
Optimisers 105 x P600